Kmda Housing

Ease of Doing Business (EODB) Services Provided by KMDA as notified by WBRTPS Act - 2013, Memo No. 2453-UD/O/M/ESTT./E-19/2014 (Pt-I) Dated - 19th July, 2017


Project Commissioned

JnNURM-UIG:

F.Y. 2011-12
Storm Water drainage for Bansberia Municipality (Project cost Rs. 29.79 Cr.)
Storm Water Drainage for Bidhannagar Municipal Area (Project cost Rs. 19.16 Cr.)
F.Y. 2012-13
Tala Palta Dedicated Transmission Main (Project cost Rs. 304.92 Cr.)
Construction of left turning North Bound off-Ramp at Beckbagan connecting AJC Bose Road Flyover (Project cost Rs. 18.06 Cr.)
F.Y. 2013-14
24x7 Comprehensive Water supply Scheme for Garulia Municipality (UA) Kolkata (Project cost Rs. 47.19 Cr.)
Water Supply Scheme for Bhatpara Municipal Area (Project cost Rs. 249.70 Cr.)
Water Supply Scheme for Baruipur Municipality (Project cost Rs. 9.52 Cr.)
Storm Water Drainage Scheme in Budge Budge Municipal Area within Kolkata U.A. (Project cost Rs. 34.80 Cr.)
24x7 WS Project for Dumdum, South DumDum and North Dumdum (Project cost Rs. 312.72 Cr.)
Storm Water Drainage for Baranagar Municipal area within Kolkata U.A. (Project cost Rs. 35.87 Cr.)
Storm Water Drainage System for Madhyamgram Municipality, Kolkata (Project cost Rs. 72.04 Cr.)
Integrated Storm Water Drainage System for Barasat Municipality, Kolkata (Project cost Rs. 85.48 Cr.)
Surface Water supply scheme for Bally Municipality (Project cost Rs. 138.49 Cr.)
Bus Terminus near Kalyani Railway Station (Project cost Rs. 6.51 Cr.)
F.Y. 2014-15
30 MGD (Ph-I) Water Treatment Plant at Dhapa (Project cost Rs. 98.75 cr.)
15 MGD Water Treatment Plant at Bansberia (Project cost Rs. 44.92 cr.)
Elevated Corridor from Kestopur to Jora Mandir on Kazi Nazrul Islam Avenue (Project cost Rs. 206.59 cr.)
Storm Water Drainage Scheme for Kamarhati Municipality (Project cost Rs. 67.57 cr.)
F.Y. 2015-16
Flyover from Parama to Park Circus (Project cost Rs. 291.66 cr.)
Four Lane Fly Over at Kamalgazi Intersection on EM Bypass connector at the starting point of Adi Ganga in Kolkata (Project cost Rs. 100.17 cr.)
Sewerage Project in Bidhannagar, Kolkata (Project cost Rs. 23.58 cr.)

Projects under UIG, JnNURM  which are to be commissioned by May 2016

Surface Water supply scheme for Barrakpore & North Barrakpore Municipal Areas
BRTS from Ultadanga to Garia in Kolkata Metropolitan Area
Construction of fly over at eastern railway main line along with approach road, Chandannagar
Vivekananda Road Flyover (Ph - I) from Howrah Bridge to CR Avenue
Flyover from Parama to Park Circus(New Work) one thru AJC Bose flyover to Maa flyover
Water Supply Scheme for Bhadreswar Municipality
Storm Water Drainage Project for Baruipur Municipality

JnNURM-BSUP:

During the period from April 2011 to October 2015, following dwelling units have been completed.

F.Y. 2011-12: 14112 dwelling units have been completed
F.Y. 2012-13: 12942 dwelling units have been completed
F.Y. 2013-14: 17436 dwelling units have been completed
F.Y. 2014-15: 10779 dwelling units have been completed
Upto October 2015: 2460dwelling units have been completed

State Plan Fund:

F.Y. 2011-12
Repairing/Replacement and strengthening of steel girder for G.T. Road bypass bridge near Bankim Setu, Howrah (Project cost Rs. 3.19 cr.)
Widening and strengthening of service road between Milan Mela and ITC Hotel (Project cost Rs. 3.62 cr.)
Water Supply scheme at Pujali Municipality (24 x 7) through ESR (Project cost Rs. 1.85 cr.)
Water Supply Scheme at Panchla (Project cost Rs. 1.63 cr.)
F.Y. 2012-13
Widening of Patipukur underpass (Project cost Rs. 15.94 cr.)
Construction of 3 lane second RoB on E.M. Bypass over Eastern railway line (Sealdah-Baruipur section) near Baghajatin station (Project cost Rs. 30.64 cr.)
Construction of surface drain at Park circus connector adjacent to Milan Mela & Parama Island (Project cost Rs. 1.50 cr.)
Nawdapara, Ariadaha 176 no. residential quarters (Project cost Rs. 6.61 cr.)
Construction of Police training school at 247, A.J.C. Bose Road (Project cost Rs. 6.61 cr.)
F.Y. 2013-14
Construction of Railway Underpass at Patipukur near DDM- Sealdah-Chitpur Sections of Eastern Railway adjacent to Railway Bridge No. 22 in connection with widening of Jessore Road (Project cost Rs. 18.85 cr.)
1.5 MGD capacity WTP within Baranagar Jute mill (Project cost Rs. 6.57 cr.)
F.Y. 2014-15
Construction of Bediapara Underpass (Project cost Rs. 14.09 cr.)
Poly-technique College at Baruipur (Project cost Rs. 12.11 cr.)
Up-gradation and renovation of Nazrul Mancha (Project cost Rs. 15.55 cr.)
Augmentation of WTP at Kalyani (Project cost Rs. 3.26 cr.)
Construction of Pedestrian Walkway in Millennium Park (Project cost Rs. 1.37 cr.)
ITI at Khasbalanda (Project cost Rs. 5.98 cr.)
Commissioned projects under State Plan Fund
Poly-technique College at Diamond Harbour (Project cost Rs. 17.24 cr.)

Projects under State Plan Fund which are to be commissioned by May 2016

Construction of proposed O.T. Complex at J.N.M. Hospital, Kalyani, Nadia
Construction of proposed Mortuary Building at J,N,M, Hospital, Kalyani, Nadia
Repair, rectification and upgradation work of King's building in the campus of Jnan Chandra Ghosh Polytechnic, 7, Mayur Bhanj Road, Kolkata-23
Augmentation of water supply Scheme Maheshtala Municipal area for Ward No- 6 & 7
Change of alignment of existing primary grid carrying treated surface water from SWTP towards Rishra Municipality
Construction of proposed Lecture Theatre hall at college of Medicine & JNM Hospital, Kalyani, Nadia
Construction of I.T.I. Building at Bauria, Block-Uluberia-II, Dist.- Howrah
Rehabilitation of Evicted Hawkers by Constructing 416 nos. hawkers stall at three different location on E.M Byepass.
Construction of Ramp in the area of KoPT adjacent to Rabindra Setu
Kulpi ITI Phase - II (Additional Infrastructure)
Falta ITI Phase - II (Additional Infrastructure)
Canning ITI Phase - II (Additional Infrastructure)
Mandir Bazar ITI Phase - II (Additional Infrastructure)
Mograhat ITI Phase - II (Additional Infrastructure)
Establishment of Govt. I.T.I. under Multi Sectoral Development Project (MSDP) at Block-Amdanga, Mouza-Nima, 24 Pgs.(N), West Bengal
Repairing, strengthening and new construction of roads along with pond protection work, drain and other allied works in the fringe area of Saptagram Panchayat under Mogra block in the District of Hooghly
Supply of surface water at Naihati Municipality and Baruipur Municipality (Project cost Rs. 2.66 crore and Rs. 4.99 crore respectively)